Home / Case Studies / Commercial
Case Study

Muckleshoot Casino Auburn Bathrooms — Quartz Vanities

Auburn, WA

At Muckleshoot Casino Resort in Auburn, WA, we expertly fabricated and installed 37 quartz bathroom vanities, enhancing the luxury and functionality of the resort's guest bathrooms.

Material
Quartz
Surface Type
Engineered quartz
Project Size
37 vanities
Edge Profile
Eased
Location
Auburn, WA
Timeline
21 days, template to install
Before & After

The transformation

After
Installation of multiple quartz bathroom vanities at Muckleshoot Casino Resort, featuring precise fabrication, consistent alignment, and professional on-site installation across 37 units in a high-traffic commercial environment.
The Challenge

High Volume Precision Fabrication

Working on a large-scale project like Muckleshoot Casino Resort presented unique challenges. With 37 vanities to fabricate and install, maintaining consistency in quality and appearance was critical. The project required precise coordination to ensure that each vanity fit perfectly within the existing bathroom spaces, which varied slightly in dimensions due to the building's construction.

Additionally, the high traffic and operational nature of the casino meant that our team had to work swiftly and efficiently to minimize disruption. Each bathroom had to be completed to exacting standards while maintaining a tight schedule to align with the resort's renovation timeline.

Finally, handling the logistics of transporting and installing multiple large quartz pieces required careful planning. The weight and size of the slabs meant that our team needed to ensure safe handling procedures were in place to prevent damage and ensure the safety of our installers.

Installation of multiple quartz bathroom vanities at Muckleshoot Casino Resort, featuring precise fabrication, consistent alignment, and professional on-site installation across 37 units in a high-traffic commercial environment.
Our Approach

Strategic Planning and Execution

To address the challenge of precision across numerous installations, we utilized the STONEEX digital laser templating system. This technology allowed us to capture accurate measurements of each space, ensuring that every vanity was custom-fitted to its specific location. This digital approach eliminated the potential for human error in measurement, critical when dealing with high volumes.

Our in-house Kirkland facility's CNC fabrication capabilities allowed us to cut each quartz piece with extreme precision. The CNC machines were programmed with data from the STONEEX scans, ensuring each cut was perfect. This process was vital for achieving the seamless joints and consistent appearance required for the project.

We coordinated closely with the casino's management to schedule installations during off-peak hours, minimizing disruption to guests. Our team was trained in efficient installation techniques, allowing us to quickly and securely install each vanity, with special attention to aligning the TopZero undermount sinks seamlessly with the quartz surfaces.

01
STONEEX Scan
Our team conducted digital laser templating of each bathroom space using the STONEEX system to ensure precise measurements for each vanity.
02
CNC Fabrication
At our Kirkland facility, we utilized CNC machines to precisely cut the quartz slabs, ensuring consistent quality and perfect fits for each vanity.
03
Seamless Sink Integration
Each quartz vanity was designed to seamlessly integrate with TopZero undermount sinks, providing a sleek and modern appearance.
04
Final Installation
Our team expertly installed the vanities on-site, conducting thorough quality checks to ensure each unit met our exacting standards.
Technical Details

Project specifications

Total Surface
37 vanities
Edge Profile
Eased
Sink
TopZero undermount sinks in each vanity
Seam Location
Seamless appearance with precision joints
Lighting
Ambient overhead lighting with focused task lighting
Fabrication Time
12 business days
Templating
STONEEX digital laser scan
Thickness
3cm (1¼″)
The Result

Stunning and Functional Vanities

The final results at Muckleshoot Casino Resort were outstanding. The 37 quartz vanities not only enhanced the aesthetic appeal of the guest bathrooms but also significantly improved their functionality. Each vanity was a perfect fit, thanks to our meticulous templating and fabrication processes.

The seamless integration of the TopZero sinks provided a sleek, modern look, while the quartz material offered durability and easy maintenance—ideal for a high-traffic environment like a casino. The management was extremely pleased with the outcome, noting an increase in positive guest feedback regarding the updated bathrooms.

The project demonstrated our ability to handle large-scale installations efficiently and to a high standard, reinforcing AbsoluteGM's reputation as a leader in commercial surface fabrication and installation in the greater Puget Sound area.

Project Gallery

The details

Project Video

Watch the build

Start Your Project

Interested in a similar project?

Schedule a consultation, visit our Kirkland showroom, or request a quote.